MDB Configuration
IEC 61439-2Dedicated outgoing breaker + busway flange transition section (count separately from cable-fed outgoing ACBs above).
Indicative Front Elevation & Column Arrangement
Proportional SchematicProject Switchgear Schedule (Multi-Panel Summary)
Collect all MDBs, SMDBs, FDBs, MCCs, and Capacitor Banks for your project, edit any assembly in place, then transfer the entire project to the Heat Dissipation Estimator.
| Panel Tag | Type | Main Info / Configuration | Size (H×W×D mm) | Sections / Mounting | Est. Weight | |
|---|---|---|---|---|---|---|
| No panels added to project yet. Configure an assembly above and click “+ Add Current Panel to Project” to build your project schedule. | ||||||
| Project Total (0 Panels • 0 Total Sections) | 0.00 m Width | Combined Lineup | ~0 kg | |||
|
Ready to estimate per-panel heat dissipation (W / kW) for all 0 panels?
|
||||||
Panel Heat Loss Parameters
IEC 61439 / TR 60890VFD dissipation modeled at ~2.8% of operating kW (standard 6-pulse industrial LV VFD efficiency baseline).
| Panel Tag | Type | Basis (RDF / Amb.) | Heat Loss (W) | Heat Loss (kW) | |
|---|---|---|---|---|---|
| No panels added yet. Click “+ Add Current Panel to Heat Schedule” (or transfer your project from Module 1) to list heat dissipation in W and kW. | |||||
| Combined Total (0 Panels) Sum applies only where listed panels share the same electrical room. | 0 W | 0.00 kW | |||
Busway Run Parameters
IEC 61439-6 SandwichActive Run Alternative Comparison (Same Length & Ambient)
| Option | Derated In | ΔV (%) | Loss (kW) | Status |
|---|
Installation Busway Voltage Drop Schedule (One-Page Summary)
Combine all feeders and risers in one sheet — runs marked “Series / Cascade” sum automatically for end-to-end VD compliance.
| Run Tag | Path Role | Busway Spec | Load (A) | L (m) / k | Derated In | ΔV (V) | ΔV (%) | Loss (kW) | Status | |
|---|---|---|---|---|---|---|---|---|---|---|
| No busway runs added yet. Configure a run above and click “+ Add Run to Installation Schedule” (or click “Load Sample Project”) to generate your one-page installation VD sheet. | ||||||||||
| Cumulative Series / Cascade Path VD (0 runs in series) | 0.00 V | 0.00% | — | |||||||
| Total Installation Busway Losses (0 total runs) | ~0.0 MWh/yr | 0.00 kW | -- | |||||||
Need an Independent ETAP Power Study?
Moving from preliminary schematic sizing to IFC or authority submittal? Aegis Grid delivers DEWA/TAQA/SEC-ready ETAP Load Flow, Short-Circuit, Protection Coordination, Arc Flash, and Harmonic studies across the UAE and GCC.